How tiles and laminate differ
| Tiles | Laminate | |
|---|---|---|
| Subfloor | Cement screed at least 28 days old, moisture below 4% (Ceresit CM 17) | Unevenness above 2 mm per 1 m must be levelled, moisture below 2.5% (Quick-Step) |
| Installation | On adhesive that covers at least 65% of the underside of the tile | Floating, with an expansion gap of at least 8–10 mm along all edges |
| Joints | Grout; silicone in corners and next to plumbing fixtures | Panel connections; a gap at walls, pipes and thresholds |
| With underfloor heating | Ceresit CL 51 is also suitable for heated floors | Quick-Step: the surface must not be warmer than 28.8 °C |
| Labour price | from €24/m² | from €6.50/m² |
Sources: Ceresit CM 17 and CL 51 technical data sheets (Henkel); Quick-Step laminate installation instructions LV. Checked 11.11.2026.
Tiles or laminate in a kitchen
In a kitchen, the risk to the floor is water by the sink, the dishwasher and the fridge. With a tiled floor, the joints next to furniture and plumbing fixtures are filled with silicone. Ceresit CL 51 waterproofing is also intended for kitchens, if the floor needs protection under the tiles.
For a kitchen, choose a laminate that its manufacturer intends for use in a kitchen. Each manufacturer writes the water resistance and cleaning requirements in its own instructions, and they differ between products. Check this before buying, not after installation. Laminate needs a gap around pipes and thresholds; Quick-Step states that the hole for a pipe must be 20 mm larger than the pipe.
Another option is vinyl flooring, which is laid in the same way as laminate but has its own manufacturer requirements.
Tiles or laminate in a hallway
In a hallway, water and sand from shoes get onto the floor. If the hallway is large, tiles can be laid by the front door and laminate in the rest. Then the transition between the coverings is important.
In the Ceresit CN 76 technical data sheet, movement joints in the levelling compound are provided also over room thresholds, and joints in the subfloor are repeated in the levelling compound. For laminate, Quick-Step requires a gap also at thresholds and under doors. That is why the transition is planned before the floor is levelled, so that the surfaces of both coverings are at the same height.
Source: Ceresit CN 76 technical data sheet 11.25; Quick-Step laminate installation instructions LV. Checked 11.11.2026.
Underfloor heating under tiles or laminate
If you plan underfloor heating in the kitchen or hallway, each covering has its own requirements. Quick-Step states that with floor heating the subfloor surface must not be warmer than 28.8 °C and the moisture must be below 1.5%. For a cement subfloor with heating under laminate and parquet, Ceresit CN 76 gives a moisture content of up to 1.8%.
Connecting a water-based underfloor heating system to the building's heating usually affects common property, because the building's heating elements are common property, so the consent of the association is usually needed. For electric floor heating, when the electrical wiring is rebuilt, a requirement for residual current protection may apply. More on the page underfloor heating.
Sources: Quick-Step instructions LV; Ceresit CN 76 technical data sheet; Law on Residential Properties (Dzīvokļa īpašuma likums), Sections 4 and 11; LV portāls 02.07.2025 on residual current protection. Checked 11.11.2026.
Before installation
- Subfloor check Unevenness and moisture are measured and compared with the covering manufacturer's requirement.
- Levelling If needed, the floor is levelled and left until it has dried.
- Acclimatising the laminate Quick-Step panels acclimatise for 48 hours in unopened packaging at room temperature in the room where they will be laid.
- Laying and joints Tiles are grouted after the adhesive manufacturer's time (CM 17: on a floor after at least 24 hours); for laminate, gaps are left and skirting boards are fitted.
How much tiles or laminate cost
| Work | Price |
|---|---|
| Tiling | from €24/m² |
| Laminate installation | from €6.50/m² |
| Vinyl flooring installation | from €10/m² |
| Floor levelling, pour or screed | from €6.50/m² |
| Demolition of old tiles | from €9/m² |
Example: a kitchen of 10 m². Tiling 10 × €24 = from €240, laminate installation 10 × €6.50 = from €65. A hallway of 6 m²: tiles from €144, laminate from €39. Prices are for labour. Materials are calculated separately in the estimate.
The price of tiling is affected by the tile size and pattern, and the price of laminate by the condition of the subfloor; skirting boards are a separate line. An exact estimate can be made after seeing the apartment.
Sources
- Screed 28 days, < 4%; 65% coverage; silicone; grout on a floor after 24 h checked 11 November 2026
- Unevenness > 2 mm per 1 m; gap 8–10 mm; holes +20 mm; 28.8 °C; moisture; acclimatisation 48 h checked 11 November 2026
- CL 51 for kitchens and heated floors checked 11 November 2026
- Movement joints at thresholds; moisture with heating 1.8% checked 11 November 2026
- Building heating elements are common property; association consent checked 11 November 2026
- Residual current protection when rebuilding the wiring checked 11 November 2026