Submit the form and we contact you within 5 minutes

Uneven or squeaky floor - what to do?

An uneven or squeaky floor needs to be understood before a new covering is laid, because on an uneven base even new laminate or parquet will move and squeak. Unevenness is usually fixed by floor levelling. If the floor sags or moves underfoot, the covering must be opened and what is underneath must be inspected.

Prepared by Dzīvokļu Remonts Rīga, updated 12 November 2026. Sources: 5

After you submit the form, we contact you within 5 minutes

Illustration: a freshly poured self-levelling floor
Illustration: a freshly poured self-levelling floor.

Get an estimate

After you submit the form, we contact you within 5 minutes

How uneven is too uneven

In the Quick-Step laminate instructions, the manufacturer states that base irregularities greater than 2 mm per 1 m must be levelled. You can check this yourself: place a straight spirit level or profile on the floor and see how big a gap is left under it.

Other manufacturers may specify other limits for their floors, so check the instructions for the covering you will lay.

Source: Quick-Step laminate installation instructions (LV). Checked 11.11.2026.

A squeaky floor: what it can mean

Squeaking means that something underfoot is moving: the floorboards, the covering on an uneven base or the base itself. What exactly can only be seen once the covering is opened.

  • Laminate or parquet laid on an uneven base can flex and squeak where there is a void underneath.
  • Check the expansion gap at the walls: Quick-Step specifies at least 8–10 mm on all edges, around pipes, thresholds and under doors.
  • A wooden floor may have boards that have come loose; then the solution is wooden floor restoration.

Source: Quick-Step laminate installation instructions (LV). Checked 11.11.2026.

The floor sags: when it becomes a common property issue

The floor finish belongs to the apartment, but floors between storeys with their heat and sound insulation are the common property of the apartment owners (Law on Residential Properties, Section 4). If, under the covering, you see that it is not the finish but the structural floor that sags, notify the building manager in writing.

In pre-war masonry buildings the floors between storeys are mostly wooden (apollo.lv). There it is worth inspecting the condition of the structural floor before a new floor. If the work affects common property, the consent of the apartment owners' association is needed.

Sources: Law on Residential Properties (Dzīvokļa īpašuma likums), Section 3, Section 4(1) paragraph 1, Section 11(3); apollo.lv on standard-series projects. Checked 11.11.2026.

Floor levelling: what manufacturers state

  • Ceresit CN 76 self-levelling compound is intended for a layer of 4–50 mm. It can be walked on after 3 hours and tiled after 3 days.
  • CN 76 dries at 4 mm per day for a layer up to 1.5 cm and 3 mm per day for a thicker layer (+23 °C, 50% humidity).
  • Under parquet, wood, laminate and resilient coverings, the moisture of a cement base may be up to 2.0% without heating and up to 1.8% with underfloor heating.
  • Movement joints: an indoor area of up to 36 m², a length-to-width ratio of up to 1.5, joints also on room thresholds.
  • Ceresit CT 17 primer dries in about 2 hours.

A thicker layer takes longer to dry and costs more, so before levelling the difference between the highest and the lowest spot is measured. If the difference is large, a floor screed is chosen.

Sources: Ceresit CN 76 technical data sheet 11.25; Ceresit CT 17 technical data sheet (Henkel). Checked 11.11.2026.

Order of work

  1. Demolition of the old covering The covering is removed and the base is inspected.
  2. Checking the base The unevenness and the moisture are measured and it is checked that the base is stable.
  3. Priming and levelling The base is primed and self-levelling compound or screed is poured.
  4. Drying The floor is left until the moisture reaches the covering manufacturer's requirement.
  5. Laying the covering Laminate, vinyl flooring, parquet or tiles are laid.

How long a renovation takes depends on the amount of work and the drying time of the materials.

What to write in the request about the floor

  • The area of the rooms in m² and the current covering.
  • Whether the floor is uneven, squeaks or sags, and in which spot.
  • If you know it, the unevenness in millimetres per 1 m or 2 m.
  • What new covering you plan and whether there will be underfloor heating.
  • The building series or year and the condition of the floor.

Whether self-levelling compound is enough or a screed is needed depends on the covering and the unevenness. We agree the price and the list of work before the job starts.

How much floor levelling costs

Work Price
Floor levelling, pouring or screed from €6.50/m²
Demolition of walls, floors and finishes from €6/m²
Laminate installation from €6.50/m²
Parquet sanding and varnishing from €23/m²

An example: a room of 18 m². Floor levelling 18 × €6.50 = from €117 and laminate installation 18 × €6.50 = from €117, in total from €234. Prices are for labour. Materials are calculated separately in the estimate. The price of levelling is affected by the layer thickness.

Sources

  1. Irregularities > 2 mm per 1 m must be levelled; gap 8–10 mm checked 11 November 2026
  2. Floors between storeys are common property; floor finishes are part of the apartment; owners' association consent checked 11 November 2026
  3. Wooden floors between storeys in pre-war buildings checked 11 November 2026
  4. CN 76: 4–50 mm, walking after 3 h, tiling in 3 days, moisture, movement joints, drying checked 11 November 2026
  5. CT 17 dries in about 2 hours checked 11 November 2026

Main prices

Main prices
Renovation types from €100
Room renovation from €3,000
Renovation work from €24
Renovation by building series from €280
Apartment replanning from €12
Renovation for your situation from €100
Private house interiors from €280
Business premises from €100

Prices are for labour. Materials are calculated separately in the estimate.

Get a price for floor levelling

After you submit the form, we contact you within 5 minutes.

A floor in layers

  1. Base

    Slab, sound insulation and screed.

  2. Covering

    Underlay and floor boards, a skirting board at the wall.

Drawing: floor layers from the slab to the covering
Drawing: floor layers from the slab to the covering.

Frequently asked questions

Can laminate be laid on an uneven floor?

Quick-Step requires irregularities greater than 2 mm per 1 m to be levelled. On an uneven base laminate can flex and squeak.

Why does new laminate squeak?

The cause may be an uneven base or a missing expansion gap at the walls and thresholds. What exactly it is can be seen when the covering is opened.

How long after levelling can a covering be laid on the floor?

It depends on the compound and the layer thickness. Ceresit CN 76 dries at 4 mm per day (for a layer up to 1.5 cm), and before the covering the moisture must meet the covering manufacturer's requirement.

What to do if the floor sags?

Open the covering and see what is sagging. If it is the structural floor, it is common property and the building manager must be notified. After you submit the form, we contact you within 5 minutes.

Tell us about the apartment

A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes