We carry out interior work in Līvāni houses in Riga and the Riga region: walls, ceilings, floors and the bathroom. Painting starts from €4/m², tiling from €24/m².
What to find out before the estimate
Each house may have been altered differently, so write what you know about your house. An exact estimate can be made after seeing the house.
In the request write what you know about the house: the year of construction, whether the walls are boarded, whether the floors are wooden, whether there has been earlier renovation. If you have a plan of the house or a technical inventory file or cadastral survey file, you can send it to the specialist when they contact you. The more is known before the estimate, the fewer surprises after demolition.
What to check in an older house before demolition
- Asbestos: asbestos cement was used for slate roofing, pipes and boards, and old vinyl floor tiles and their adhesive may contain asbestos. It cannot be reliably identified by appearance, only in a laboratory. Damaged asbestos is dangerous because the fine fibres get into the airways.
- Electrical wiring: in many homes the wiring dates from the Soviet era and is worn out. When rebuilding the installation in an existing building, residual current protection is needed; for socket and lighting circuits no more than 30 mA.
- Gas: a gas hob can be moved within one room in agreement with the gas supplier; moving it to another room needs technical conditions and a building design.
- Floors: under laminate, Quick-Step requires levelling unevenness greater than 2 mm per 1 m.
For more on asbestos, see the article asbestos in an apartment during renovation.
Sources: European Commission SAMANCTA; RSU seminar materials; LV portāls 2023 and 02.07.2025; LBN 261-15, paragraph 28.1; LBN 241-15, paragraphs 7 and 9; Quick-Step instructions LV. Checked 11.11.2026.
Documents
Interior finishing work needs no documents. If load-bearing walls, floors between storeys or the volume of the house are changed, it is a reconstruction or renovation that needs an explanatory memorandum or a building design, and work starts only after the building board's note. Ask the building board of your municipality.
Sources: Construction Law (Būvniecības likums), Section 1, paragraphs 4 and 9, and Section 17; Cabinet Regulation No. 529 (“Ēku būvnoteikumi”, Building Construction Regulations), paragraphs 1.¹, 7.1 and 7.³. Checked 11.11.2026.
Order of work
- Initial data In the request state the structure of the walls and floors, the utilities and any traces of damp.
- Demolition The old finish; suspicious materials are sent for analysis before being damaged.
- Utilities Electrical wiring under the direction of a certified construction specialist, pipes.
- Walls and floors Plasterboard lining or plastering, floor levelling.
- Finishing Skimming, painting, tiles, floor covering.
How long the renovation takes depends on the amount of work and the drying time of the materials.
Price of renovating a Līvāni house
- Painting walls or ceilings: from €4/m².
- Skimming walls or ceilings: from €10/m².
- Plasterboard partition wall: from €12/m².
- Laying laminate: from €6.50/m².
- Tiling: from €24/m².
- Bathroom renovation (all the work): from €3,000.
Prices are for labour. Materials are calculated separately in the estimate. Example: a 15 m² room with 40 m² of wall: skimming 40 × €10 = €400 and painting 40 × €4 = €160, total from €560.
The price changes with the area in m² and the number of rooms, whether the renovation is cosmetic or full, the condition of the walls, floors and ceilings, whether the wiring and pipes are replaced, and the chosen finish. An exact estimate can be made after seeing the house.
What interior work includes
What this work includes
- demolition of the old finish;
- plasterboard lining and partition walls;
- skimming and painting;
- floor levelling and covering;
- tiling and waterproofing.
What is calculated separately
- materials and plumbing;
- asbestos analysis and removal of asbestos materials;
- electrical wiring;
- roof, facade and foundations;
- removal of construction waste.
Sources
- Documents not needed for an interior design project without renovation or reconstruction; simplified renovation; building design in other cases checked 11 November 2026
- Reconstruction and renovation; work starts after the building board's note checked 11 November 2026
- Asbestos is dangerous if damaged; fibres in the airways checked 11 November 2026
- Asbestos is determined by laboratory; vinyl tiles may contain asbestos checked 11 November 2026
- Wiring built in the Soviet era checked 11 November 2026
- Residual current protection 30 mA; installation under the direction of a certified specialist checked 11 November 2026
- Residual current protection in existing buildings checked 11 November 2026
- Moving a gas hob checked 11 November 2026
- Unevenness > 2 mm per 1 m checked 11 November 2026