Bathroom renovation in Riga

Bathroom renovation in Riga and the Riga region is all the work in a wet room: demolishing the old finish, waterproofing, tiling and installing the bath, shower, sink and toilet.

After you submit the form, we contact you within 5 minutes

from€3,000

Bathroom renovation (all the work), materials and plumbing fixtures separate.

Illustration: a finished bathroom with a shower and large-format tiles
Illustration: a finished bathroom with a shower and large-format tiles.

Get an estimate

After you submit the form, we contact you within 5 minutes

The whole job costs from €3,000, with materials and plumbing fixtures separate in the estimate. The larger the room and the more complicated the work, the higher the price.

Why a bathroom is a separate job

In a bathroom, water reaches the floor and walls every time someone washes. That is why waterproofing is needed under the tiles, and the joints in corners and at plumbing fixtures must be flexible. If a layer is left out, water can get into the floor slab and appear on the neighbour's ceiling.

The second reason is the building's utilities. In an apartment building the risers are common property of the apartment owners, but the pipes from the riser to your fittings are part of the apartment. The bath, shower, toilet and sink belong to the apartment, and they can be changed without the neighbours' consent.

Law on Residential Properties (Dzīvokļa īpašuma likums), Section 3(2) and Section 4(1). Checked 11.11.2026.

Order of work in a bathroom renovation

  1. Demolition The old tiles, bath, sink and toilet are removed, if they are being replaced. The condition of the walls and floor is revealed, and then you can see how much levelling is needed.
  2. Pipes and electrics If the water pipes are replaced or fittings are moved, this is done before any finishing. Electrical wiring is installed under the direction of a certified construction specialist, and when the wiring is rebuilt, residual current protection is installed.
  3. Preparing the base The walls and floors are levelled and primed. Ceresit states that a cement screed and plaster under tiles must be at least 28 days old with moisture below 4%.
  4. Waterproofing The manufacturer recommends applying Ceresit CL 51 in at least two coats. Waterproofing tape is worked into corners and joints, and collars are used around pipes and drains.
  5. Tiling and joints Tiles are fixed to a prepared surface; with Ceresit CM 17, the adhesive must cover at least 65% of the underside of the tile. In corners and at plumbing fixtures the joints are filled with silicone, not grout.
  6. Installing the plumbing After the grout has hardened, the bath or shower, sink, toilet and taps are installed. For Ceresit CE 40 grout, the manufacturer states water exposure after 24 hours.

Ceresit CL 51, CM 17 and CE 40 technical data sheets; LBN 261-15, paragraph 55; amendments to LBN 261-15 from 01.07.2025 on residual current protection. Checked 11.11.2026.

What you decide

  • Bath or shower: a shower with a drain at floor level needs the floor to slope towards the drain, more on the page shower with a floor drain.
  • Tile size and pattern: large-format tiles and patterns cost more than a plain layout.
  • Whether to replace the pipes up to the riser: old pipes under new tiles will have to be opened up later.
  • Whether the risers have to be replaced now: they are common property, so replacement needs a decision of the apartment owners' association, and the building manager organises the work.
  • Where the washing machine will go and whether it needs a socket.
  • Whether you will choose the materials and plumbing fixtures yourself.

Leave access by the risers, for example a hatch. The owner must allow specialists authorised by the association or the building manager to carry out work to maintain the building's utilities, and a riser tiled over makes this difficult.

Law on Residential Properties (Dzīvokļa īpašuma likums), Section 10(1) point 7 and Section 11(3). Checked 11.11.2026.

Ventilation in a bathroom

In residential buildings, bathrooms and toilets are ventilated through natural extract ducts. If a fan and a shared ventilation system are connected to the bathroom, the air ducts of the kitchen and sanitary rooms may only be connected each to its own duct. Natural ventilation ducts in an apartment are cleaned and inspected at least once every 10 years, and in rooms with gas appliances at least once every five years. If mirrors and walls stay damp for a long time after washing, check the duct before the renovation.

LBN 231-15, sub-paragraph 85.4 and paragraph 90.²; Fire Safety Regulations currently in force (Cabinet Regulation No. 238), paragraph 80. Checked 11.11.2026.

How much a bathroom renovation costs

Prices are for labour. Materials are calculated separately in the estimate. A bathroom renovation, all the work, costs from €3,000. If only a few jobs are needed, they are calculated line by line:

Work Price
Demolition of old tiles from €9/m²
Waterproofing in a bathroom from €6/m²
Tiling from €24/m²
Floor drain installation from €100 per drain
Replacing or installing a bath from €130 per bath
Installing a toilet during a renovation from €50 per toilet

Example: tiling 18 m² × €24 = from €432, waterproofing 5 m² × €6 = from €30 and floor drain installation from €100, in total from €562. This covers only these three jobs, without demolition, levelling and plumbing.

Bathroom renovation costs: what they depend on

  • the floor area in m² and the area of walls to be tiled;
  • the condition of the walls and floor after demolition;
  • whether the pipes, risers and electrical wiring are changed;
  • the tile size and the number of corners;
  • a shower with a drain or a bath.

For construction waste removal, see buvgruzuizvesanariga.lv. All prices are on the page prices.

What is in the price of a bathroom renovation

What this work includes

  • demolition of the old finish and fittings;
  • waterproofing for the floor and the wet zone;
  • tiling the walls and floor;
  • installing the bath or shower, sink and toilet.

What is calculated separately

  • tiles, adhesive, waterproofing material and other materials;
  • the bath, shower enclosure, toilet, sink and taps;
  • replacing the risers and electrical wiring.

Sources

  1. Apartment part and common property; risers; access for specialists; association consent checked 11 November 2026
  2. Ceresit CL 51: at least two coats, tape in corners, collars checked 11 November 2026
  3. Ceresit CM 17: 65% coverage, silicone in corners, screed at least 28 days and moisture below 4% checked 11 November 2026
  4. Ceresit CE 40: water exposure after 24 hours checked 11 November 2026
  5. Electrical wiring installed under the direction of a certified construction specialist checked 11 November 2026
  6. Residual current protection when rebuilding the wiring checked 11 November 2026
  7. Bathrooms are ventilated through natural extract ducts; each with its own duct checked 11 November 2026
  8. Cleaning and inspection of ventilation ducts every 10 or 5 years checked 11 November 2026
  9. Sanitary rooms above living rooms are permitted if the requirements are met checked 11 November 2026

Page updated 12 November 2026. Prices checked 11 November 2026.

Price for this job

Price for this job
Bathroom renovation (all the work) materials and plumbing fixtures separate from €3,000
Tiling on a prepared surface from €24/m²
Waterproofing in a bathroom before tiling from €6/m²
Floor drain installation slope and tiles separate from €100 per drain

Prices are for labour. Materials are calculated separately in the estimate.

Get a price for a bathroom renovation

After you submit the form, we contact you within 5 minutes.

Waterproofing in a bathroom

  1. The corner

    A sealing tape in the joint between floor and wall.

  2. Layers

    Primer, waterproofing, tile adhesive and tiles.

Drawing: waterproofing layers in a bathroom corner
Drawing: waterproofing layers in a bathroom corner.

Frequently asked questions

Can a bathroom be renovated without replacing the risers?

Yes, if the risers are in good condition. If they are old, think about it before tiling, because replacing them later means cutting through the new finish. Risers are common property, so replacing them needs a decision of the apartment owners' association, and the building manager organises the work. More on the page riser replacement.

Do I need the neighbour's consent if the bathroom is above their room?

No, a requirement for such consent is no longer in force. Sanitary rooms above a neighbour's living rooms are permitted if the requirements for soundproofing, waterproofing, ventilation and others are met (LBN 200-21, paragraph 136).

My toilet or tap is just leaking. Is that a bathroom renovation?

No, that is plumbing repair. For that kind of work, see santehnikisriga.lv.

How long will the bathroom be out of use?

How long a renovation takes depends on the scope of work and the drying time of the materials. Waterproofing, tile adhesive and grout each have their own drying time, which is stated by the manufacturer.

How do I find out the price for my bathroom?

In your request, write the room dimensions, the building series and what you are changing. An exact estimate can be made after seeing the apartment. After you submit the form, we contact you within 5 minutes.

Get a price for a bathroom renovation

The address, the floor area and which rooms need work. A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes