Submit the form and we contact you within 5 minutes

Bathroom renovation in a Lithuanian project building

Bathroom renovation in a Lithuanian project building is work in a five-storey 464 series building.

After you submit the form, we contact you within 5 minutes

from€3,000

Bathroom renovation (all work), materials and plumbing fixtures separately.

Illustration: a small bathroom with a shower
Illustration: a small bathroom with a shower.

Get an estimate

After you submit the form, we contact you within 5 minutes

These buildings have been built since the early 1960s, and nopo.lv mentions worn risers, electrical wiring and waterproofing problems. The whole bathroom job costs from €3,000, with materials separately in the estimate.

The Lithuanian project, or the 464 series

In Riga, the 464 series buildings are called the Lithuanian project. They were built from the early 1960s, the improved version from 1966, in five storeys. The walls are grey reinforced concrete panels, and the partitions are gypsum-concrete. Such buildings are found in Iļģuciems, Purvciems, Āgenskalns, Imanta, Dzirciems, Bolderāja, Ķengarags, Jugla and elsewhere.

A Ministry of Economics study of 13 buildings handed over from 1964 to 1978 found the buildings of this series safe for continued use. The size and layout of the bathroom depend on the particular apartment, so write the dimensions in the request.

What to check in your apartment before the renovation

  • Whether the bath and the toilet are in one room or separate.
  • What condition the risers are in and whether the building plans to replace them; ask the building manager.
  • Whether the ventilation duct draws, especially on the ground floor, because nopo.lv mentions poor ventilation on the lower floors.
  • Whether there are old traces of leaks on the ceiling or by the floor.
  • What the electrical wiring is like and whether the bathroom has a socket.

Gypsum-concrete partitions and waterproofing

A gypsum-concrete partition in a wet room needs careful preparation. For Ceresit CL 51 waterproofing, the manufacturer requires the base to be dry, load-bearing, stable and clean, and crumbling surfaces are primed first. For gypsum bases the moisture limit is low: no more than 1.0% for gypsum plasters, and no more than 0.5% for anhydrite and gypsum levelling compounds.

Waterproofing is applied in at least two coats so that the dry layer is 0.5 mm, tape is applied in corners and joints, and collars around pipes. More on this work on the page waterproofing in a bathroom.

Ceresit CL 51 technical data sheet, 11/2025. Checked 11.11.2026.

Panel walls and enlarging the room

The housing website nopo.lv writes that the panel walls of the 464 series are hard to replan. If you want to enlarge the bathroom, first find out which wall is load-bearing: this can only be said from the building's design or a structural engineer's opinion. An opening in a load-bearing wall needs an explanatory memorandum with the structural solution of the opening and an assessment of the effect on the strength of the building, and, if the building is divided into apartment properties, the consent of more than half of the apartment owners.

Space can also be gained within the layout: a shower with a drain instead of a bath, a wall-hung sink, shelves in niches. On small rooms, see the page small bathroom renovation.

Cabinet Regulation No. 529, paragraph 7.², sub-paragraph 8 and sub-paragraphs 24.4.2–24.4.3; explanation of Riga State City Municipality on LV portāls 04.12.2025. Checked 11.11.2026.

Risers and electrics

The riser is common property, so replacing a section of riser in an apartment needs the association's consent, and the work is organised by the building manager. If it is replaced for the whole building, the decision is taken by the association, and the costs are usually covered by each owner according to their share of the common property. If the building will replace the risers, it is better to tile the bathroom afterwards, otherwise the finish around the riser will have to be opened. Leave a hatch by the risers.

If old wires are replaced, the new installation needs residual current protection, and it is installed under the supervision of a certified construction specialist. More on the page replacing electrical wiring.

Law on Residential Properties, Section 4, Section 10(1) point 7 and Section 13(1); LBN 261-15, paragraph 55 and the amendments from 01.07.2025. Checked 11.11.2026.

How much a bathroom renovation in a Lithuanian project building costs

Prices are for labour. Materials are calculated separately in the estimate. The whole bathroom renovation costs from €3,000. If you also replace a section of riser in the apartment, add from €100 per riser, and for a new socket from €12 per point.

The price is affected by the room size, the condition of the walls after demolition, whether the electrical wiring, pipes and risers are changed, and the chosen finish. All prices are on the page prices.

What the price includes

What this work includes

  • demolition, priming of the base and waterproofing;
  • tiling of walls and floor;
  • installation of the bath or shower, sink and toilet.

What is calculated separately

  • materials and plumbing fixtures;
  • replacing a section of riser (from €100 per riser), which needs the association's consent;
  • replacing the electrical wiring, if it is needed;
  • a structural engineer's opinion and documents if the room is enlarged.

Sources

  1. 464 series walls, gypsum-concrete partitions, waterproofing problems, worn risers and electrical wiring, poor ventilation on the lower floors, hard to replan checked 11 November 2026
  2. 464 series from the early 1960s, improved version from 1966, neighbourhoods checked 11 November 2026
  3. Lithuanian project: grey concrete panels, 5 storeys checked 11 November 2026
  4. Ministry of Economics study: 13 buildings handed over in 1964–1978, safe for use checked 11 November 2026
  5. Ceresit CL 51: base, moisture, coats, tape checked 11 November 2026
  6. Opening in a load-bearing wall: explanatory memorandum and its annexes checked 11 November 2026
  7. Consent of 50% + 1 owners for an opening in a load-bearing wall checked 11 November 2026
  8. Riser is common property, costs by share of common property, access checked 11 November 2026
  9. Ventilation duct inspection once every 10 years checked 11 November 2026
  10. Electrical wiring under the supervision of a certified construction specialist checked 11 November 2026
  11. Residual current protection when electrical wiring is rebuilt checked 11 November 2026

Page updated 12 November 2026. Prices checked 11 November 2026.

Price for this job

Price for this job
Bathroom renovation (all work) materials and plumbing fixtures separately from €3,000
Waterproofing in a bathroom before tiling from €6/m²
Replacing a section of riser in an apartment the association's consent is needed from €100 per riser

Prices are for labour. Materials are calculated separately in the estimate.

Get a price for a bathroom in a Lithuanian project building

After you submit the form, we contact you within 5 minutes.

A shower without a tray

  1. Slope

    The floor falls gently to the drain.

  2. Drain

    At the wall, with a pipe under the floor.

Drawing: a shower floor sloping to the drain
Drawing: a shower floor sloping to the drain.

Frequently asked questions

Are the Lithuanian project and the 464 series the same thing?

Yes, in Riga the Lithuanian project is the name for five-storey 464 series buildings with grey concrete panels.

What should be done about ventilation on the ground floor?

The housing website nopo.lv mentions poor ventilation on the lower floors of these buildings. Before the renovation, check whether the duct draws; ducts are cleaned and inspected at least once every 10 years, and in rooms with gas appliances at least once every five years. About mould, see the page mould in the bathroom.

Can tiles be laid directly on a gypsum-concrete partition?

They can, if the base is dry, stable and clean, primed and covered with waterproofing in the wet zone. The moisture limits for gypsum bases are set by the material manufacturer.

How do I request a bathroom renovation in a Lithuanian project building?

Write the address, the floor and the room dimensions. After you submit the form, we contact you within 5 minutes.

Get a price for a bathroom in a Lithuanian project building

The address, the floor area and which rooms need work. A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes