Renovation advance payment: how much and when to pay

A renovation advance is a matter of agreement: write how much and when to pay in the contract and tie it to a specific part of the estimate, for example the materials or the first stage. Pay in a way that lets you prove the payment, and do not pay for work that has not started yet more than you are ready to risk. If the contractor is late, the law gives you the right to an additional deadline, to withdraw and to a refund.

Prepared by Dzīvokļu Remonts Rīga, updated 12 November 2026. Sources: 5

After you submit the form, we contact you within 5 minutes

Illustration: a renovation plan, a tape measure and tile samples on a table
Illustration: a renovation plan, a tape measure and tile samples on a table.

Get an estimate

After you submit the form, we contact you within 5 minutes

Why an advance is asked for

In a renovation a large part of the costs arise before the first day of work: materials, tiles, doors, plumbing. If the contractor buys the materials, the advance can cover exactly those. If you choose and buy the materials yourself, the need for an advance is smaller, and the work can be paid for by stages after completion.

So before talking about an advance, clearly separate work and materials in the estimate. Prices are for labour. Materials are calculated separately in the estimate. In the request you can write whether you will choose the materials yourself.

How to split the payments

  1. Tie the advance to a specific item Write in the contract what the advance is paid for: for example tiles and waterproofing materials for the bathroom. Then it is clear what you can ask back if the work does not start.
  2. Pay by stages Divide the estimate into stages that can be checked: demolition, utilities, wet rooms, finishing. Pay for each stage after you accept it.
  3. Keep the final payment back Pay the last part after the work is accepted and the defects are remedied.
  4. Ask for receipts for materials If the contractor buys materials with your advance, ask for the purchase receipts or invoices.
  5. Pay by bank transfer or against a receipt In a dispute the customer has to prove payment, for example with a receipt or correspondence. A bank transfer with the purpose “advance under estimate No. 12” is clear proof.

Source: explanation by the Latvian Council of Sworn Advocates (LZAK) on LV portāls, 26.11.2025 (oral contract, proving payment). Checked 11.11.2026.

Example with an estimate

A 2-room apartment of 50 m², cosmetic renovation: 50 × €100 = from €5,000 (labour), materials in the estimate separately. In such an estimate it makes sense to separate two payment parts: the materials, which can be paid against receipts when they are bought, and the labour, which is paid by stages after completion.

In a bathroom, similarly: tiling 18 m² × €24 = from €432, waterproofing 5 m² × €6 = from €30, floor drain installation from €100, a total of from €562 for these three jobs. Each of them can be accepted separately before the next follows. A whole bathroom renovation is from €3,000.

If the work does not start or is late

The Consumer Rights Protection Law provides that if no deadline has been agreed, the service is provided within a reasonable time. If the provider is late, the consumer gives an additional deadline. If that is not met either, the consumer can withdraw from the contract, and the money paid must be refunded within 14 days.

  1. Remind them in writing Send a message or e-mail with the date of the contract, the amount paid and a new deadline.
  2. Withdraw from the contract If the additional deadline is missed, give written notice of withdrawal and ask for a refund.
  3. Contact PTAC The consumer can ask the Consumer Rights Protection Centre (PTAC) or the Consumer Disputes Resolution Commission to assess the provider's conduct.

Sources: Consumer Rights Protection Law, Section 30(4), (5) and (7); LZAK explanation on LV portāls, 26.11.2025. Checked 11.11.2026.

Renovation scams: warning signs

  • There is no company name or registration number; if construction work is offered, the company is not in the Register of Construction Merchants.
  • They ask for a large cash advance with no receipt.
  • They refuse a written estimate or contract.
  • The advance is tied neither to materials nor to a stage, but is “to reserve the time”.
  • They press you to pay before the apartment has been seen and an estimate drawn up.

Providing construction services without registration in the Register of Construction Merchants can end, for a legal entity, in a fine of up to 1,000 fine units (up to €5,000). The BIS register is available free of charge: Register of Construction Merchants.

Sources: Construction Law, Sections 22 and 30; Cabinet Regulation No. 116. Checked 11.11.2026.

Write it in the contract

Write the advance amount, what it is paid for, the schedule of payments by stage and the procedure for refunding the advance if the contract is terminated. The other points of the contract: renovation contract. We agree the price and the list of work before the job starts.

Sources

  1. Proving payment, PTAC, dispute commission checked 11 November 2026
  2. Reasonable deadline, additional deadline, withdrawal, refund within 14 days checked 11 November 2026
  3. Registration in the Register of Construction Merchants, fine up to 1,000 fine units checked 11 November 2026
  4. BIS register free of charge checked 11 November 2026
  5. 1 fine unit = €5 checked 11 November 2026

Related prices

Related prices
Cosmetic renovation of apartment floor area from €100/m²
Bathroom renovation (all work) materials separately from €3,000

Prices are for labour. Materials are calculated separately in the estimate.

Get an estimate with work and materials separately

After you submit the form, we contact you within 5 minutes.

Frequently asked questions

How big an advance should you pay for a renovation?

The size of the advance is set by the contract the parties agree. In practice the advance is tied to the materials or the first stage, and the work is paid for after completion, by stages.

Can you get the advance back if the renovation does not start?

If the provider is late, give a written additional deadline. If that is not met either, the Consumer Rights Protection Law allows you to withdraw from the contract, and the money paid must be refunded within 14 days.

Should you pay the advance in cash?

If you pay in cash, ask for a receipt. In a dispute the customer has to prove payment, and a transfer or a receipt makes that easier.

Is it better to buy the materials yourself?

That way the advance becomes smaller and you see what you are paying for. But then the responsibility for the quantity of materials and the delivery time is yours. In the request, write whether you will choose the materials yourself.

Tell us about the apartment

A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes