Submit the form and we contact you within 5 minutes

Where to start an apartment renovation

Where to start an apartment renovation? With a list of exactly what you will change, and with the question of whether the work affects load-bearing walls, risers or other common property. That decides whether documents are needed, whether the consent of the association or of another apartment owner is needed, and whether it will be a cosmetic or a full renovation. Only after that does it make sense to compare estimates and put the work in order.

Prepared by Dzīvokļu Remonts Rīga, updated 12 November 2026. Sources: 12

After you submit the form, we contact you within 5 minutes

Illustration: a renovation plan, a tape measure and tile samples on a table
Illustration: a renovation plan, a tape measure and tile samples on a table.

Get an estimate

After you submit the form, we contact you within 5 minutes

First steps before the renovation

  1. Write down what you will change Go through the rooms and write down: walls, ceilings, floor covering, doors, electrical wiring, pipes, bathroom, kitchen. Add the area in m² and the building series or year of construction. This list becomes the basis of the estimate.
  2. Decide the type of renovation If the existing electrical wiring and pipes stay, a cosmetic renovation is usually enough. If rooms are stripped down to the structure and the utilities are changed, it is a full renovation. More: cosmetic or full renovation.
  3. Separate your part from the common property The Law on Residential Properties states what belongs to the apartment and what to the whole building. Load-bearing walls, risers and the building's utility systems are common property, and work on them needs the association's consent.
  4. Check whether documents are needed Construction documents are not needed for painting, wallpapering or replacing the floor covering. For demolishing a wall or an opening in a load-bearing wall they are needed. A table by type of work: does a renovation need a permit.
  5. Ask the building manager Find out whether the building has house rules adopted by the association or set renovation hours, how the water is shut off, and how draining the heating system is agreed if you are replacing radiators.
  6. Agree in writing Write the list of work, the price and the deadlines into the estimate and the contract. What it must contain: renovation contract.

What is your apartment and what is common property

This boundary decides what you may do on your own and where the consent of other owners or the building manager is needed. An owner may carry out construction work in their apartment without the consent of other owners if the regulations are followed and the work does not affect common property or other apartments.

Element Owned by What it means for the renovation
Non-load-bearing partitions, finishes of walls, ceilings and floors, doors the apartment can be changed without the consent of other owners; to demolish a wall in Riga, a construction notice is submitted
Utilities up to the risers, bathroom, toilet and kitchen fittings the apartment can be changed, but without touching the riser
Risers and the building's utility systems common property the association's consent is needed; in practice, start with the building manager
Radiators, if their operation depends on the building's heating common property the association's consent is needed; replacement and draining of the heating are agreed with the building manager
Load-bearing walls, walls between apartments, floor slabs common property an opening in a load-bearing wall needs an explanatory memorandum and the consent of more than half of the owners
Windows and the external structures of balconies and loggias common property windows may be replaced at the owner's own expense, in agreement with the building manager

Sources: Law on Residential Properties, Section 3(2), Section 4(1) point 1, Section 11; Cabinet Regulation No. 529 (“Ēku būvnoteikumi”, Building Construction Regulations); Riga municipality's explanation on LV portāls 04.12.2025. Checked 11.11.2026.

The order of an apartment renovation

Renovation work usually goes from rough work to clean work: first what creates dust and moisture and stays inside the walls, then the finishing. In a particular apartment the order may change, but the general order is as follows.

  1. Demolition: the old finish, tiles, floor covering, partition walls if they are being changed.
  2. Utilities: electrical wiring, water and sewage pipes up to the riser, heating.
  3. Floor levelling or screed and wall plastering.
  4. Wet rooms: waterproofing and tiling.
  5. Plasterboard structures, skimming, ceilings.
  6. Painting or wallpaper.
  7. Floor covering, interior doors, skirting boards.
  8. Installation of plumbing fixtures, sockets, switches and light fittings.

The order is not just habit: materials have drying times. For example, the technical data sheet of Ceresit CM 17 tile adhesive requires the cement screed and plaster under tiles to be at least 28 days old and the moisture below 4%. More on this: how long an apartment renovation takes.

In old buildings, demolition can uncover materials that may contain asbestos, for example old vinyl floor tiles and their adhesive. This cannot be determined reliably by appearance; it is determined in a laboratory. More: asbestos in an apartment during renovation.

Sources: Ceresit CM 17 technical data sheet (10/2026); European Commission, SAMANCTA; RSU seminar materials on asbestos. Checked 11.11.2026.

How much an apartment renovation costs

Prices are for labour. Materials are calculated separately in the estimate. The main lines: cosmetic renovation from €100/m² of apartment area, full renovation from €280/m², turnkey renovation from €600/m².

Example: a 2-room apartment of 50 m². Cosmetic renovation: 50 × €100 = from €5,000 (labour). The same apartment with a full renovation: 50 × €280 = from €14,000 (labour).

The price is determined by the apartment area in m² and the number of rooms, the type of renovation, the condition of the walls, floors and ceilings, whether the electrical wiring, pipes and risers are changed, and the chosen finish. An exact estimate can be made after seeing the apartment. All lines: prices.

What can go wrong

  • The finish is started before the utilities: afterwards freshly painted walls are chased for wires and pipes.
  • An opening is chiselled out in a load-bearing wall without an explanatory memorandum. The Construction Law provides for a natural person a warning or a fine of up to 400 fine units (up to €2,000), and the building board can order the previous condition to be restored.
  • The riser is boxed in. The owner must allow specialists authorised by the building manager to reach the building's utilities, so leave a hatch.
  • Agreement is made orally. An oral contract can be valid, but in a dispute the customer has to prove what was agreed and how much was paid.

Sources: Construction Law, Sections 18 and 25; Administrative Liability Law (Administratīvās atbildības likums), Section 16 (1 fine unit = €5); Law on Residential Properties, Section 10; LZAK explanation on LV portāls 26.11.2025. Checked 11.11.2026.

Sources

  1. Parts of the apartment and common property; construction work in the apartment without other owners' consent if it does not affect common property checked 11 November 2026
  2. Construction documentation is not needed for interior work checked 11 November 2026
  3. Building intent documents are not needed for an interior design project; notice, explanatory memorandum checked 11 November 2026
  4. Wall demolition in Riga: construction notice; opening in a load-bearing wall: more than half of the owners checked 11 November 2026
  5. Penalty for construction work without an explanatory memorandum up to 400 fine units; restoring the previous condition checked 11 November 2026
  6. 1 fine unit is €5 checked 11 November 2026
  7. Screed and plaster under tiles at least 28 days old, moisture below 4% checked 11 November 2026
  8. Asbestos is dangerous if damaged; EU ban from 01.01.2005 checked 11 November 2026
  9. Asbestos cannot be identified by appearance; it is determined in a laboratory checked 11 November 2026
  10. Oral contract: the customer has to prove the contract and the payment checked 11 November 2026
  11. Electrical wiring inspection once every 10 years checked 11 November 2026
  12. Wires in many homes are 30–50 years old checked 11 November 2026

Related prices

Related prices
Cosmetic renovation of apartment area, labour from €100/m²
Full renovation of apartment area, labour from €280/m²
Turnkey renovation materials separately in the estimate from €600/m²

Prices are for labour. Materials are calculated separately in the estimate.

Get an apartment renovation estimate

After you submit the form, we contact you within 5 minutes.

In what order a renovation is done

  1. A plan first

    The list of work, the area and the materials.

  2. Then from rough to fine

    Demolition, services, screed, finishing.

Drawing: the order of a renovation in five steps
Drawing: the order of a renovation in five steps.

Frequently asked questions

Where to start a renovation in an old apartment?

With the condition of the utilities. LV portāls writes that in many homes the electrical wiring was installed in the Soviet era and the wires are 30–50 years old. The Fire Safety Regulations currently in force require the electrical wiring to be inspected once every 10 years. An inspection report helps to decide whether a full renovation is needed. More: old electrical wires in an apartment.

Do materials have to be chosen before the estimate?

Not necessarily, but the estimate will be more precise if you know whether the floor will have tiles or laminate and what size the tiles will be. Work and materials are calculated separately in the estimate. In the request, write whether you will choose the materials yourself.

Does a cosmetic renovation need a permit?

If only interior work is planned in the apartment, for example painting, wallpaper or replacing the floor covering, construction documentation is not needed. If you change walls or move utilities, check whether a construction notice is needed.

What should be written in a renovation request?

The address, the area in m², the building series or year of construction, which rooms you will renovate and what work is needed. After you submit the form, we contact you within 5 minutes.

Tell us about the apartment

A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes