Submit the form and we contact you within 5 minutes

Wall demolition in an apartment - partition or load-bearing wall

Demolishing a wall in an apartment depends on what kind of wall it is.

After you submit the form, we contact you within 5 minutes

from€6/m²

Demolition of walls, floors and finishing, per m², waste removal separate.

Illustration: a bathroom after the old tiles were removed
Illustration: a bathroom after the old tiles were removed.

Get an estimate

After you submit the form, we contact you within 5 minutes

A non-load-bearing partition can be demolished with a construction notice, but a load-bearing wall is the building's common property, and an opening in it needs a structural engineer's solution and the owners' association's consent. Demolition of walls and finishing costs from €6/m², and documents are priced by estimate.

Partition or load-bearing wall

Under the Law on Residential Properties, non-load-bearing internal partitions belong to the apartment owner. Load-bearing walls and columns, walls between apartments and floor slabs are the common property of all the apartment owners. So the first step is not a hammer, but the answer to the question of what kind of wall this is.

The building series gives only a direction. For the 602 series it has been published that all the internal walls are usually load-bearing, for the 467 series that practically all the walls are load-bearing, while in the 103 series the partitions are described as non-load-bearing. Plans differ within one series, and walls may have been changed earlier. Which walls in a particular apartment are load-bearing is determined from the building's design documents and a structural engineer's assessment.

Law on Residential Properties (Dzīvokļa īpašuma likums), Section 3(2) and Section 4(1) point 1. Series data: the nopo.lv description of apartment building series. Checked 11.11.2026.

Demolishing a partition

According to the Riga municipality's explanation, to demolish a non-load-bearing wall in order to join rooms, an architect with a construction practice certificate prepares a plan, and a construction notice is submitted in BIS (the Construction Information System) as a simplified renovation. If the non-load-bearing wall separates two apartments, the owners of both apartments must agree; the consent of the other owners in the building is not needed.

A partition often contains electrical wires, switches and sockets, and sometimes a ventilation duct. A ventilation duct can be part of the building's engineering systems, which are common property, so it is checked before the work, and the wires are disconnected before demolition.

Demolishing a load-bearing wall

Making, reconstructing or demolishing an opening in a load-bearing wall is a simplified reconstruction. For it, an explanatory memorandum is submitted to the building board, with the solution for the structural details of the opening and an assessment of the effect on the overall strength and stability of the building. An architect and a structural engineer with a construction practice certificate are needed, and, if the building is divided into apartment properties, the consent of more than half (50% + 1) of the apartment owners.

If a load-bearing wall is to be demolished completely, or the work strengthens load-bearing elements, it is a reconstruction that does not fall under the simplified types. For such cases a building design of minimum scope is prepared and a building permit is obtained. Work with an explanatory memorandum or a building permit may be started only after the building board's mark that the conditions for starting construction work have been met.

Cabinet Regulation No. 529 of 02.09.2014, sub-paragraph 1.¹ 6, sub-paragraph 7.² 8, paragraph 7.³, sub-paragraphs 24.4.2 and 24.4.3; Construction Law, Sections 1 and 17; Riga municipality reply on LV portāls 04.12.2025. Checked 11.11.2026.

How a wall is demolished

  1. Documents and consents A notice or an explanatory memorandum in BIS; with an explanatory memorandum, work only after the building board's mark.
  2. Disconnecting utilities The wires in the wall are disconnected, and the sockets and switches are removed.
  3. Demolition The finish and the wall are removed in parts so as not to damage the floor and the neighbouring walls.
  4. Waste The wall material is heavy and bulky. For removal of construction waste, see buvgruzuizvesanariga.lv.
  5. Joints Where the wall was, a strip is left in the floor, ceiling and neighbouring walls: it is plastered, levelled and then finished together with the room.

In older buildings the finish and some materials can contain asbestos, for example asbestos-cement boards or vinyl floor tiles and their adhesive. It cannot be reliably identified by appearance; it is determined in a laboratory. More on the page asbestos in an apartment during renovation.

If a wall was demolished without documents

If a building inspector finds unauthorised construction, they stop the work, and the authority decides on restoring the previous condition or on permission to continue after the requirements are met. The owner pays the costs. When buying an apartment in which a wall has already been demolished, it is worth comparing the plan in the cadastral survey file with what is actually there.

How much does wall demolition in an apartment cost?

Demolition of walls, floors and finishing: from €6/m². Example: a partition 3 m long and 2.6 m high is 7.8 m², and demolition is 7.8 × €6 = from €46.80. Replanning documents and approval: price by estimate, determined by whether the work affects load-bearing structures, which document is needed and whether a structural engineer's opinion is needed. Prices are for labour. Materials are calculated separately in the estimate.

After demolition, plastering of walls from €8/m² and floor levelling from €6.50/m² usually follow, where the wall was. The price is affected by the wall material and thickness, whether there are wires in the wall, and the condition of the walls, floors and ceilings. An exact estimate can be made after seeing the apartment.

What this work includes

  • Demolition of a non-load-bearing partition and its finish
  • Disconnecting the wires in the wall before demolition
  • Plastering the joints and floor levelling, if included in the estimate

What is calculated separately

  • Replanning documents and approval
  • The structural engineer's solution for an opening in a load-bearing wall
  • Removal of construction waste
  • Laboratory testing for asbestos, if suspected

Sources

  1. Partitions are part of the apartment, load-bearing walls are common property (Law on Residential Properties, Sections 3 and 4) checked 11 November 2026
  2. 602 series: internal walls usually load-bearing; 467: practically all; 103: partitions non-load-bearing checked 11 November 2026
  3. Riga municipality: a non-load-bearing wall with a notice, an opening in a load-bearing wall with an explanatory memorandum, consents checked 11 November 2026
  4. Simplified reconstruction, explanatory memorandum, building design (Cabinet Regulation No. 529) checked 11 November 2026
  5. Reconstruction, conditions for starting, unauthorised construction (Construction Law, Sections 1, 17 and 18) checked 11 November 2026
  6. Vinyl floor tiles and adhesive can contain asbestos checked 11 November 2026
  7. Asbestos cannot be reliably identified by appearance, it is determined in a laboratory checked 11 November 2026

Page updated 12 November 2026. Prices checked 11 November 2026.

Price for this job

Price for this job
Demolition of walls, floors and finishing waste removal separate from €6/m²
Plastering walls joints after demolition from €8/m²
Replanning documents and approval depends on the type of wall price by estimate

Prices are for labour. Materials are calculated separately in the estimate.

Get a price for wall demolition

After you submit the form, we contact you within 5 minutes.

Frequently asked questions

Can a partition be demolished without a permit?

For demolishing a non-load-bearing wall to join rooms, the Riga municipality points to a construction notice in BIS as a simplified renovation. It is a simpler document than an explanatory memorandum, but a wall should not be demolished without it.

Can the wall between the kitchen and a room be demolished in the 602 series?

For the 602 series it has been published that the internal walls are usually load-bearing. A particular wall can be assessed only from the building's design and a structural engineer's opinion; an opening in a load-bearing wall is possible with an explanatory memorandum and the association's consent. More on the page can a wall in an apartment be demolished.

Whose agreement is needed to demolish a wall between two apartments?

If the wall is non-load-bearing, the owners of both apartments. If it is load-bearing, the consent of more than half of the apartment owners is needed as well.

What must be done after a wall has been demolished with documents?

After the work, the owners update the cadastral survey file so that the apartment plan matches the new layout.

Get a price for wall demolition

The address, the floor area and which rooms need work. A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes